How we scope a project in one call

By The Forma Team · · 4 min read

Every project starts with one 45-minute call. By the end of it we can usually tell a prospective client their rough timeline and price range — not because we’re fast talkers, but because we ask the same five questions every time.

“What changes if this works?”

Not “what do you want built” — what metric moves. A rebrand that’s supposed to raise a Series A round is a different project than one meant to stop losing enterprise deals to a more polished competitor, even if the deliverable looks identical on paper.

“Who else has to say yes?”

One founder who can approve a direction in a Slack message is a fast project. A marketing VP, a CEO and a board member who each need to sign off separately is a slower one, and the fee reflects the extra rounds of revision that process requires.

Why this question matters

Approval chains are the single biggest driver of timeline overruns we see — bigger than scope, bigger than revisions. We price for the chain, not just the deliverable.

“What have you already tried?”

Half the value of hiring an outside team is telling you what not to repeat. If you’ve already run two internal attempts at this, we want to see them before we start — the failure modes usually point straight at the real problem.

“What’s the actual deadline, and why?”

“ASAP” isn’t a deadline. A board meeting on a specific date is. We scope differently when there’s a real external constraint versus general urgency, and we’ll say so plainly on the call.

“Who’s doing this if not us?”

If the honest answer is “our in-house designer, eventually,” that’s useful information too — sometimes the right call is to tell a prospective client they don’t need an agency yet.